Compare
Backup power kit Deye 125 kW + Dyness Stack314 482.4 kWh, 2 clusters, 3-phase
Inverter125 kWBatteries482.4 kWhFrom battery≈125 kW

Illustration: Deye inverter and 4 Dyness Stack314 stacks from the manufacturers’ renders; module count is in the specification. Click to enlarge.

Backup power kit Deye 125 kW + Dyness Stack314 482.4 kWh, 2 clusters, 3-phase

Three-phase high-voltage hybrid inverter Deye SUN-125K-SG02HP3-EU-GM10, 125 kW + Dyness Stack314 energy storage system 482.4 kWh (2 clusters of 15 modules, one per battery input): 30 × S51314 + 2 × SBDU200 with base + 2 × Expansion Base.

Kit priceUAH 3,199,290excl. VAT
In stock

The price includes the inverter, 30 S51314 battery modules, 2 SBDU200 control units with bases. 2 × Expansion Base for the second stacks of both clusters is included in the price. The breaker cabinet with cables, installation and delivery are quoted separately.

Need a different capacity? All kits → Calculate autonomy in the calculator → Order installation: fill in the brief →
Get a quote with installation

Quick questions:

InverterDeye SUN-125K-SG02HP3-EU-GM10
Rated inverter power125 kW
Phases3
BatteryDyness Stack314: heated S51314 modules, LiFePO₄ 51.2 V / 314 Ah / 16.08 kWh
Number of modules30 × S51314
Battery configuration2 clusters × 15 S51314 modules, one per input, 768 V nominal
Battery capacity482.4 kWh (rated, 30 × 16.08)
Installation space≈ 4.61 × 2.21 m (W × H)

How long will it run Комплект резервного живлення Deye 125 кВт + Dyness Stack314 482,4 кВт·год, 2 кластери, 3 фази?

    Required capacity = load × time ÷ 0.855: we use 90 % of capacity as a reserve and 95 % conversion efficiency. Battery-side power = battery voltage × the inverter's battery-input current (manufacturer data). This is a guide, not a guarantee: inrush currents, temperature and settings are not included.

    A backup power kit for a commercial or industrial site with a three-phase supply: a 125 kW Deye SUN-125K-SG02HP3-EU-GM10 hybrid inverter and a 482.4 kWh Dyness Stack314 high-voltage energy storage system. The battery is two clusters of 15 S51314 modules, each with its own SBDU200 control unit with base. The inverter has two independent battery inputs, so each cluster connects to a separate input; if one cluster is switched off for service, the other keeps working. Layout: 4 stacks: two clusters, each 8 + 7 modules. Cluster nominal voltage is 768 V, operating range 672–864 V; the inverter battery input range is 160–1000 V.

    Calculated battery power based on the inverter battery input current: ≈153.6 kW (2 × 768 V × 100 A), not less than the inverter’s rated power (the inverter limits it to 125 kW). The name states the inverter’s rated power and the batteries’ nominal capacity. The power available from the battery depends on the cluster voltage and the inverter’s battery input current (100 A per input). The breaker cabinet with cables, installation and delivery are quoted separately.

    Features

    • Deye SUN-125K-SG02HP3-EU-GM10 three-phase hybrid inverter, 125 kW, 2 battery inputs
    • Dyness Stack314: 482.4 kWh nominal capacity, 30 × S51314, 2 clusters
    • Battery configuration: 2 clusters × 15 S51314 modules, one per input, 768 V nominal
    • Layout: 4 stacks: two clusters, each 8 + 7 modules
    • Battery power (calculated): ≈153.6 kW (2 × 768 V × 100 A)
    • Heated LiFePO₄ modules, ≥ 8000 cycles, aerosol fire extinguisher in every module (Dyness data)
    • The price includes the inverter, modules, control unit with base and 2 × Expansion Base; breaker cabinet with cables, installation and delivery are extra

    Kit contents

    ComponentPurposeQuantity
    Deye SUN-125K-SG02HP3-EU-GM10 hybrid inverterinverter1 pcs
    Dyness Stack314 S51314 battery module, 16.08 kWhbattery module30 pcs
    Dyness SBDU200 control unit with baseCluster BMS (one per cluster)2 pcs
    Dyness Expansion Basebase for the second stack, included in the kit price2 pcs

    Not included in the price: the breaker cabinet with cables, installation and delivery. We select and quote these for your site.

    Technical specifications

    Kit contentsDeye SUN-125K-SG02HP3-EU-GM10 inverter × 1; Dyness S51314 modules, 16.08 kWh × 30; Dyness SBDU200 control unit with base × 2; Expansion Base × 2
    InverterDeye SUN-125K-SG02HP3-EU-GM10
    Rated inverter power125 kW
    Phases3
    Inverter typeHybrid, for high-voltage batteries
    Inverter battery voltage range160–1000 V
    Inverter battery inputs2 independent
    Inverter battery charge / discharge current100 + 100 A (100 A per input)
    BatteryDyness Stack314: heated S51314 modules, LiFePO₄ 51.2 V / 314 Ah / 16.08 kWh
    Battery typeLiFePO₄, high-voltage (HV), heated
    Number of clusters2
    Number of modules30 × S51314
    Control unit and baseDyness SBDU200 with base × 2 — one per cluster; 134.4–864 V, up to 200 A; Expansion Base × 2 — for the second stack
    Layout4 stacks: two clusters, each 8 + 7 modules Note: an S51314 module weighs over 110 kg. A stack of 7–8 modules is over 2 m tall and must be anchored to a wall or split into parallel racks; an engineer checks the permissible floor load before installation.
    Battery configuration2 clusters × 15 S51314 modules, one per input, 768 V nominal
    Cluster nominal voltage768 V
    Cluster operating voltage672–864 V
    Battery capacity482.4 kWh (rated, 30 × 16.08)
    Usable energy (95% DoD)≈458.3 kWh in total
    Battery weight (Dyness datasheet)≈3496 kg without the Expansion Base in total
    Battery power (calculated)≈153.6 kW (2 × 768 V × 100 A) — not less than the inverter’s rated power (the inverter limits it to 125 kW)
    Backup powerThe name states the inverter’s rated power and the batteries’ nominal capacity. The power available from the battery depends on the cluster voltage and the inverter’s battery input current (100 A per input).
    Not included in the priceBreaker cabinet with cables, installation and delivery

    Deye and Dyness manufacturer data. Please confirm the configuration before ordering.

    Installation space

    How much space the kit needs: the layout we use on our sites, clearances per the manufacturer’s manual. Approximate figures; the exact layout is agreed during the site visit.

    ≈ 4.61 m↕ ≈ 2.21 m
    Battery on the floor, inverter on the wall next to it, breaker box below the inverter (too tall to fit the inverter above the battery). Dashed areas are the manufacturer’s clearances.
    Layoutbattery on the floor, inverter on the wall next to it, breaker box below the inverter (too tall to fit the inverter above the battery)
    Width≈ 4.61 m; with the side clearances of the inverter ≈ 5.11 m
    Equipment height≈ 2.21 m
    Free wall height≈ 2.66 m
    Depth from the wall≈ 0.42 m + 1 m free access in front
    Floor area for batteries≈ 3.38 × 0.42 m
    Total equipment weight≈ 3 658 kg (batteries ≈ 3 496 kg)
    How the width is calculated4 × battery column 770 + 300 between them + clearance 500 + inverter 734 = 4 614 mm; + clearance 500 = 5 114 mm
    How the height is calculatedbattery column 2 207 + 450 free above the battery; breaker zone 500 (box 400 + 50 to battery and inverter; not less than the inverter’s bottom clearance 500) + inverter 1 091 + 500 free above the inverter; equipment 2 207 mm, with clearances 2 657 mm

    Clearances around the inverter: Deye manual: approx. 50 cm to the sides, above and below, 1 m in front. The size of the inverter’s breaker box (height 400 mm; a small box between inverter and battery, not the main panel), 50 mm from it to the battery and the inverter and 100 mm between battery columns are our assumptions for a typical installation, not manufacturer data. Equipment sizes and weights are from the manufacturers’ datasheets. Cable trays, room ventilation and floor load for heavy batteries are checked during the site visit. Dyness Stack314 column height = base 133 + control unit 230 + modules of 230.5 mm each; above 8 modules the manufacturer advises two columns; 450 mm above the column.

    Similar products

    Inverter125 kWBatteries257.28 kWhFrom battery≈81.9 kW

    Inverter + battery kit

    Backup power kit Deye 125 kW + Dyness Stack314 257.28 kWh, 2 clusters, 3-phase

    Three-phase high-voltage hybrid inverter Deye SUN-125K-SG02HP3-EU-GM10, 125 kW + Dyness Stack314 energy storage system 257.28 kWh (2 clusters of 8 modules, one per battery input): 16 × S51314 + 2 × SBDU200 with base

    • 125 kW
    • 257.28 kWh
    • 3 phases
    • 2 clusters

    Suitable for: business

    In stock
    UAH 1,916,190 excl. VATDetails

    FAQ

    What is included in the kit?

    Three-phase high-voltage hybrid inverter Deye SUN-125K-SG02HP3-EU-GM10, 125 kW + Dyness Stack314 energy storage system 482.4 kWh (2 clusters of 15 modules, one per battery input): 30 × S51314 + 2 × SBDU200 with base + 2 × Expansion Base. The breaker cabinet with cables, installation and delivery are quoted separately.

    What does the price include?

    Price: UAH 3,199,290 excl. VAT. The price includes the inverter, 30 S51314 battery modules, 2 SBDU200 control units with bases. 2 × Expansion Base for the second stacks of both clusters is included in the price. The breaker cabinet with cables, installation and delivery are quoted separately.

    Is the kit in stock?

    Yes, the kit is in stock. A manager will confirm the delivery and installation dates after your request.

    How much power does the kit deliver from the battery?

    The name states the inverter’s rated power and the batteries’ nominal capacity. The power available from the battery depends on the cluster voltage and the inverter’s battery input current (100 A per input). For this kit: ≈153.6 kW (2 × 768 V × 100 A), not less than the inverter’s rated power (the inverter limits it to 125 kW).

    How many modules should I choose?

    The higher the cluster voltage, the more power the inverter can draw from the battery: at 100 A per input, 4 modules give ≈20 kW, 8 give ≈41 kW, 15 give ≈77 kW, and two clusters of 15 give up to 125 kW. If you need a lot of power from the battery, start from 8 modules or two clusters. An engineer will match the configuration to your load.

    How long will the kit power my site?

    It depends on the load. The battery’s nominal capacity is 482.4 kWh; the calculator on the "Kits" page will show the approximate runtime, or an engineer will calculate it in the quote.

    [→] — Request

    Calculation for a business

    Describe the site and the task: we will select the configuration, check compatibility and send a commercial proposal with the system composition.

    Photos of the distribution board, a list of appliances or a roof plan are easier to send by e-mail. Planning an installation? Fill in the technical brief — for a home or a business.

    Goal