Backup and autonomous power for business

Your business keeps running when the power goes out

We supply, install and set up backup power systems up to 1000 kW, energy storage and solar power plants matched to your loads and existing grid connection, so tills, refrigeration, servers and production equipment keep running during outages.

Call an engineer
Containerized energy storage systems at a commercial site
  • Up to 1000 kWbackup power systems for business
  • Kyiv & Oblastinstallation and service; equipment across Ukraine
  • Turnkeyfrom load calculation to service
  • EquipmentDeye · Fox ESS · Felicity Solar · Dyness · SOLA

How the system works at your site

The energy storage system sits between the grid and your loads. It charges from solar panels or the grid and powers your equipment when the power goes out.

iENERGY energy storage system connection diagram: solar panels via AC or DC coupling, main board, meter and grid, business loads via an additional board, control via EMS and the cloud
  • Solar panels connect to the system on the alternating current (AC) or direct current (DC) side.
  • The main board and meter connect the system to the grid: it works both with and without the grid.
  • Loads: your equipment, if needed via a separate board for critical circuits only.
  • EMS and cloud: remote control and monitoring of the system.

[01] — Who it's for

What is your role? We'll show you what matters to you

No downtime, unnecessary costs or surprises

  • We identify which circuits are truly critical and put only those on backup, so you don't overpay for unneeded power.
  • Combined with a solar plant, the system reduces electricity bills, and peak shaving cuts peak loads. We calculate payback using your tariff and operating schedule.
  • One contractor from calculation to installation, commissioning and service.

[02] — What the system keeps running

What goes on backup

Critical circuits usually go on backup. We check the starting currents of pumps and compressors separately, since the power margin depends on them.

  • Cash registers, terminals, internet and telephony
  • Refrigeration equipment
  • Sales floor and office lighting
  • Computers, servers, network equipment
  • Video surveillance and alarms
  • Production equipment and compressors

[03] — How we work

From calculation to service

  1. Calculation

    You send the input data, and an engineer assesses the load, required power and backup time.

  2. Site visit

    In Kyiv and Kyiv Oblast, we inspect the switchboard, grid connection and installation location and agree which circuits go on backup.

  3. Commercial proposal

    Equipment list, cost, availability, and delivery and installation timelines.

  4. Supply

    We supply equipment and components to the agreed specification.

  5. Installation

    We install and connect the equipment to the manufacturer's requirements.

  6. Commissioning

    We configure the system, test backup operation and show your staff how to operate it.

  7. Service

    Installation and service: Kyiv and Kyiv Oblast. We ship equipment throughout Ukraine; in other cities installation is not guaranteed.

Delivery and installation timelines are given in the commercial proposal.

[04] — Typical solutions

Typical solutions by site type

Office and shop

Cash registers, terminals, internet, computers, sales floor lighting. A small office or shop usually needs 10–15 kW.

Café, warehouse and refrigeration

Cold rooms and display cases, coffee machines, extractor hood, cash register. The starting currents of compressors must be taken into account.

Manufacturing

Critical lines, compressors, server room. A single inverter covers 50–125 kW; larger systems use parallel connection, up to 1000 kW of backup power.

All business equipment is in the catalog

[05] — Ready-made kits

Recommended configurations

The inverter (kW) determines how many appliances can run at the same time, the battery (kWh) determines for how long. The runtime on each card is a guide for an average load of 15–30 % of the smallest inverter power in the group and the largest capacity among the group’s ready-made kits, excluding conversion losses and depth of discharge. Click a card to open all matching kits with filters you can change or reset.

[07] — Warranties and documents

What you get besides the equipment

Manufacturer's warranty

The equipment is covered by the manufacturer's warranty. Terms and conditions are as stated in the documents for the specific model.

Terms

Manufacturers' equipment

Deye, Fox ESS, Felicity Solar, Dyness and SOLA: hybrid inverters, LiFePO₄ batteries, industrial energy storage systems.

Catalog

Model documentation

Manufacturer datasheets and certificates are on the product pages, in PDF format.

Example

Where we work

Installation and service: Kyiv and Kyiv Oblast. We ship equipment throughout Ukraine; in other cities installation is not guaranteed.

Contacts

[08] — Availability and timelines

Availability and timelines up front

If the model you need is out of stock, delivery can take up to 3 months. The installation schedule is currently booked about a month ahead.

  • When we prepare the calculation, we will tell you what is in stock and what you will have to wait for.
  • If you need it done by a certain date, mention it in your request and we will take it into account.
Information is current as of 11.10.2026.

[09] — Questions

Answers before the calculation

How much does it cost?

It depends on the power, capacity and which circuits go on backup. Equipment prices are in the catalog; the turnkey cost with installation is calculated once we receive the input data.

Can only part of the equipment be put on backup?

Yes, and that's the most common approach: critical circuits such as cash registers, refrigeration, lighting and communications go on backup. This reduces the system cost.

Will a system with solar panels pay for itself?

Panels reduce your daytime electricity bills and the battery provides backup. Payback depends on your tariff and operating schedule; we calculate it for each site.

Can it work together with a generator?

Yes. The hybrid system switches to the battery automatically and covers short outages, while the generator covers long ones. Switchover time depends on the inverter model.

[→] — Request

Get a calculation for your site

Leave your contacts and a few words about the site. An engineer will select a system and give you the timelines.

You can attach a single-line diagram, a photo of the board or meter data to your request, or send them by email.

+ Attach a file with input data

One file up to 5 MB: PDF, photo, Excel or Word. Send larger files to info@ienergy.com.ua.