Compare
Dyness Stack314 S51314

Dyness manufacturer photo: an assembled Stack314 stack. Click to enlarge.

Dyness Stack314 S51314 16.08 kWh heated battery module

A 51.2 V / 314 Ah / 16.08 kWh LiFePO₄ module for the Dyness Stack314 high-voltage system: 3–15 modules per cluster, up to 241 kWh.

PriceUAH 91,650 / pc
In stock

Equipment price, excl. VAT. Delivery, installation and accessories are calculated separately.

Need a different capacity? All batteries → Calculate autonomy in the calculator → Order installation: fill in the brief →
Get a quote with installation

Quick questions:

Build your own. Choose the number of Stack314 modules for an inverter in the “Build your own” configurator:

Battery typeLiFePO₄
Module energy, kWh16.08
Module nominal voltage, V51.2
Modules per cluster3–15 in series
Protection ratingIP20

Dyness Stack314 is a LiFePO₄ high-voltage energy storage system for small commercial and industrial sites: shops, warehouses, production sites, farms and office buildings. The S51314 is its battery module: 51.2 V, 314 Ah, 16.08 kWh. Modules are stacked on top of each other without a rack and connect plug-and-play: 3 to 15 modules in series per SBDU200 control unit give 48.2–241.1 kWh and 134.4–864 V. Up to 12 such clusters can be connected in parallel, up to 2.89 MWh.

Recommended current is 140 A (0.45C), maximum 200 A (0.64C), depth of discharge 95%, cycle life 8000+ cycles. Every module has a built-in aerosol fire extinguisher that, according to the manufacturer, eliminates a fire threat within 5 seconds. The heated control unit allows operation from −20 to +55 °C. The IP20 enclosure with forced-air cooling is for a dry utility room. The module works only as part of a Dyness Stack314 system: 3 to 15 modules in series per SBDU200 control unit with base. For the Deye SUN-125K-SG02HP3 hybrid inverter (160–1000 V battery input) the minimum is 4 modules per cluster. We confirm the configuration and inverter compatibility before ordering.

Features

  • 16.08 kWh, 51.2 V, 314 Ah (LiFePO₄)
  • Cluster: 3–15 modules, 48.2–241.1 kWh, 134.4–864 V
  • 140 A recommended, up to 200 A maximum
  • Rack-free plug-and-play stacking
  • Built-in aerosol fire extinguisher in every module
  • Operation from −20 to +55 °C with the heated control unit
  • Up to 12 clusters in parallel, up to 2.89 MWh
  • 95% depth of discharge, ≥ 8000 cycles
  • CAN and RS485 interfaces

Technical specifications

Battery typeLiFePO₄
Module energy, kWh16.08 (usable 15.27 at 95% DoD)
Module nominal voltage, V51.2
Module capacity, Ah314
Charge / discharge current, A140 recommended (0.45C), 200 max. (0.64C)
Module max. power, kW10.24 (recommended 7.17)
Modules per cluster3–15 in series
Cluster operating voltage, V134.4–864
Cluster energy, kWh48.2–241.1
Depth of discharge95%
Cycle life≥ 8000 cycles (0.2C, 25 °C, 95% DoD, to 70% capacity)
Operating temperaturecharge −20…+55 °C (heated), discharge −20…+55 °C
Coolingforced air
Fire suppressionbuilt-in aerosol fire extinguisher
Scalabilityup to 12 clusters in parallel, up to 2.89 MWh
CommunicationCAN, RS485
Protection ratingIP20
Module dimensions (W×D×H), mm770×425×230
Module weight, kg114–115
Cluster weight, kg38 + 114 × number of modules
Stack installationNote: an S51314 module weighs over 110 kg. A stack of 7–8 modules is over 2 m tall and must be anchored to a wall or split into parallel racks; an engineer checks the permissible floor load before installation.
System also needsDyness SBDU200 control unit with base (1 per cluster)

Dyness data (STACK314 datasheet) and supplier data. 51.2 V is the voltage of one module; a high-voltage system takes at least 3 modules in series with an SBDU200 control unit and base (sold separately). The price is per module.

Similar products

LiFePO₄ battery

Dyness STACK100 S51100

A 51.2 V / 5.12 kWh LiFePO₄ module for the Dyness STACK100 high-voltage system: 3 to 15 modules per stack

  • 5.12 kWh
  • 51.2 V module
  • stack 15.36–76.8 kWh
In stock
UAH 41,830 / pc excl. VATDetails

LiFePO₄ battery

Deye GB-W-Pack12-2-A3

A 51.2 V / 235 Ah / 12.03 kWh LiFePO₄ module for the Deye GB-W high-voltage system: 5–16 modules in series, 60–192 kWh

  • 12.03 kWh
  • 51.2 V
  • HV 5–16 pcs
Contact us for availability
UAH 93,530 / pc excl. VATDetails

LiFePO₄ battery

Deye BOS-B-Pack16-A3

High-voltage LiFePO₄ battery module 51.2 V / 16.08 kWh for BOS-B Pro-A3 systems

  • 16.08 kWh
  • 51.2 V module
  • system up to 257 kWh
In stock
UAH 96,350 / pc excl. VATDetails

LiFePO₄ battery

Felicity FLA48314-EU

51.2 V / 16 kWh, 314 Ah low-voltage LiFePO₄ battery

  • 16 kWh
  • 51.2 V
  • up to 15 in parallel
In stock
UAH 117,229 / pc excl. VATDetails

FAQ

Can I install a single module?

No. 51.2 V is the voltage of one module, and Stack314 is a high-voltage system: 3 to 15 modules in series (48.2–241.1 kWh) per SBDU200 control unit with base. The Deye SUN-125K-SG02HP3 inverter needs at least 4 modules. The price on the site is per module.

Which inverters does it work with?

The module works only as part of a Dyness Stack314 system: 3 to 15 modules in series per SBDU200 control unit with base. For the Deye SUN-125K-SG02HP3 hybrid inverter (160–1000 V battery input) the minimum is 4 modules per cluster. We confirm the configuration and inverter compatibility before ordering.

How much energy is actually available?

The manufacturer specifies 95% depth of discharge: a module gives about 15.3 kWh of usable energy, an 8-module cluster about 122 kWh, a 15-module cluster about 229 kWh. Runtime depends on the load, so we calculate it for your site.

What is included in the price?

The price is for the equipment, excl. VAT. Cables, switchgear, protection, installation and setup are calculated after a site visit or from a photo of the distribution board.

[→] — Request

Tell us about your property

We will select the configuration, check compatibility and calculate the cost with installation.

Photos of the distribution board, a list of appliances or a roof plan are easier to send by e-mail. Planning an installation? Fill in the technical brief — for a home or a business.