Deye 25 kW 3-phase + 10 × BOS-GM5.1 51.2 kWh
Inverter25 kWBatteries51.2 kWh

Kit components in the manufacturer's photo: inverter, HVB750V control unit, BOS-GM5.1 module and 3U-HRACK rack; quantities are in the specification. Click to enlarge.

Deye 25 kW 3-phase + 10 × BOS-GM5.1 51.2 kWh kit

A 25 kW Deye SUN-25K-SG01HP3-EU-AM2 three-phase hybrid inverter and a Deye BOS-G high-voltage battery: 10 BOS-GM5.1 modules (51.2 kWh), 1 HVB750V/100A-EU control unit and 1 3U-HRACK rack.

Estimated kit priceUAH 662,800excl. VAT
Availability to be confirmedWe'll confirm availability and delivery time in the commercial proposal.

Estimated kit price excl. VAT: the sum of average market prices of the components from sellers in Ukraine (checked on 15.10.2026; SUN-20K-SG05LP3 inverter and 3U-HRACK rack prices updated on 25.10.2026), rounded to UAH 100. Installation, cables and delivery are extra.

Need a different capacity? All kits → Calculate autonomy in the calculator → Order installation: fill in the brief →
Get a quote with installation

Quick questions:

InverterDeye SUN-25K-SG01HP3-EU-AM2
Rated inverter power25 kW
Phases3
BatteryDeye BOS-G: BOS-GM5.1 modules, LiFePO₄ 51.2 V / 100 Ah / 5.12 kWh
Number of battery modules10 × BOS-GM5.1
Battery configuration1 cluster × 10 modules, 512 V nominal
Battery capacity51.2 kWh (rated, 10 × 5.12)
Installation space≈ 1.50 × 2.24 m (W × H)

How long will it run Deye 25 кВт 3 фази + 10 × BOS-GM5.1 51,2 кВт·год?

    Required capacity = load × time ÷ 0.855: we use 90 % of capacity as a reserve and 95 % conversion efficiency. Battery-side power = battery voltage × the inverter's battery-input current (manufacturer data). This is a guide, not a guarantee: inrush currents, temperature and settings are not included.

    A kit for businesses and large three-phase homes: a 25 kW Deye SUN-25K-SG01HP3-EU-AM2 hybrid inverter and a 51.2 kWh Deye BOS-G high-voltage LiFePO₄ battery made of 10 BOS-GM5.1 modules of 5.12 kWh each. The battery is assembled as 1 cluster of 10 modules; each cluster has its own HVB750V/100A-EU control unit and sits in a 19-inch 3U-HRACK rack.

    All components come from one manufacturer: the inverter works with high-voltage batteries, and the cluster voltage (512 V nominal) is within its battery input range. The calculated battery power is about 25.6 kW.

    Features

    • 25 kW Deye SUN-25K-SG01HP3-EU-AM2 three-phase hybrid inverter
    • LiFePO₄ battery, 51.2 kWh nominal capacity: 10 × BOS-GM5.1
    • Battery configuration: 1 cluster × 10 modules, 512 V nominal
    • Battery power: ≈25.6 kW (1 × 512 V × 50 A), no less than the inverter's rated power
    • Inverter and battery from the same manufacturer; compatibility as per the manufacturer's documentation (links above)
    • Scalability: up to 12 BOS-GM5.1 modules per cluster (Deye BOS-G documentation); a 3U-HRACK rack holds 12 modules

    Kit contents

    Not included in the price: cables between the battery and inverter, switchgear and protection in the distribution board, solar panels, installation, setup and delivery. We select and quote these for your site.

    Technical specifications

    Kit contentsDeye SUN-25K-SG01HP3-EU-AM2 inverter × 1; Deye HVB750V/100A-EU control unit × 1; Deye BOS-GM5.1 modules, 5.12 kWh × 10; Deye 3U-HRACK rack (12 modules + control unit) × 1
    InverterDeye SUN-25K-SG01HP3-EU-AM2
    Rated inverter power25 kW
    Phases3
    Inverter typeHybrid, for high-voltage batteries
    Battery voltage range160–700 V
    Inverter battery inputs1
    Inverter battery charge / discharge currentup to 50 A (Deye datasheet 09.2026)
    BatteryDeye BOS-G: BOS-GM5.1 modules, LiFePO₄ 51.2 V / 100 Ah / 5.12 kWh
    Battery typeLiFePO₄, high-voltage (HV)
    Number of battery modules10 × BOS-GM5.1
    Battery configuration1 cluster × 10 modules, 512 V nominal
    Battery capacity51.2 kWh (rated, 10 × 5.12)
    Control unit (BMS)HVB750V/100A-EU × 1 — one per cluster; 120–750 V, 100 A
    Rack3U-HRACK × 1 — 19", for 12 modules + control unit
    Battery power (calculated)≈25.6 kW (1 × 512 V × 50 A) — not less than the inverter's rated power
    ScalabilityUp to 12 BOS-GM5.1 modules per cluster (Deye BOS-G documentation); the 3U-HRACK rack holds 12 modules
    Not included in the priceBattery-to-inverter cables, switchgear and protection in the distribution board, solar panels, installation, setup and delivery

    Deye manufacturer data. Confirm the configuration before ordering.

    Installation space

    How much space the kit needs: the layout we use on our sites, clearances per the manufacturer’s manual. Approximate figures; the exact layout is agreed during the site visit.

    ≈ 1.50 m↕ ≈ 2.24 m
    Battery on the floor, inverter on the wall next to it, breaker box below the inverter (too tall to fit the inverter above the battery). Dashed areas are the manufacturer’s clearances.
    Layoutbattery on the floor, inverter on the wall next to it, breaker box below the inverter (too tall to fit the inverter above the battery)
    Width≈ 1.50 m; with the side clearances of the inverter ≈ 2.00 m
    Equipment height≈ 2.24 m
    Free wall height≈ 2.24 m
    Depth from the wall≈ 0.59 m + 1 m free access in front
    Floor area for batteries≈ 0.59 × 0.59 m
    Total equipment weight≈ 571 kg (batteries ≈ 540 kg)
    How the width is calculatedbattery rack 589 + clearance 500 + inverter 408 = 1 497 mm; + clearance 500 = 1 997 mm
    How the height is calculatedbattery rack 2 240; breaker zone 500 (box 250 + 50 to battery and inverter; not less than the inverter’s bottom clearance 500) + inverter 638 + 500 free above the inverter; equipment 2 240 mm, with clearances 2 240 mm

    Clearances around the inverter: Deye manual: approx. 50 cm to the sides, above and below, 1 m in front. The size of the inverter’s breaker box (height 250 mm; a small box between inverter and battery, not the main panel), 50 mm from it to the battery and the inverter and 100 mm between battery columns are our assumptions for a typical installation, not manufacturer data. Equipment sizes and weights are from the manufacturers’ datasheets. Cable trays, room ventilation and floor load for heavy batteries are checked during the site visit. Deye 3U-HRACK cabinet: 589 × 590 × 2240 mm, up to 12 modules plus the control unit.

    Similar products

    Inverter25 kWBatteries61.44 kWh

    Inverter + battery kit

    Deye 25 kW 3-phase + 12 × BOS-GM5.1 61.44 kWh

    Three-phase hybrid inverter Deye SUN-25K-SG01HP3-EU-AM2 25 kW + Deye BOS-G high-voltage battery: 12 × BOS-GM5.1 (61.44 kWh), 1 × HVB750V/100A-EU, 1 × 3U-HRACK

    • 25 kW
    • 61.44 kWh
    • 3 phases

    Suitable for: houses, business

    Availability to be confirmed
    UAH 759,100 excl. VATDetails
    Inverter20 kWBatteries48 kWh

    Inverter + battery kit

    Deye 20 kW 3-phase + 3 × SE-F16-C 48 kWh

    Three-phase hybrid inverter Deye SUN-20K-SG05LP3-EU-SM2 20 kW + 3 × Deye SE-F16-C low-voltage LiFePO₄ batteries, 16 kWh each (48 kWh)

    • 20 kW
    • 48 kWh
    • 3 phases

    Suitable for: houses, business

    Availability to be confirmed
    UAH 415,100 excl. VATDetails
    Inverter20 kWBatteries56.16 kWh

    Inverter + battery kit

    Fox ESS 20 kW 3-phase + 8 × CQ7 56.16 kWh

    Three-phase hybrid inverter Fox ESS P3-Pro-20.0 20 kW + Fox ESS CQ7 high-voltage battery: 1 × CQ7-M and 7 × CQ7-S (56.16 kWh)

    • 20 kW
    • 56.16 kWh
    • 3 phases

    Suitable for: houses, business

    Contact us for availability
    UAH 545,674 excl. VATDetails
    Inverter20 kWBatteries61.44 kWh

    Inverter + battery kit

    Deye 20 kW 3-phase + 12 × BOS-GM5.1 61.44 kWh

    Three-phase hybrid inverter Deye SUN-20K-SG01HP3-EU-AM2 20 kW + Deye BOS-G high-voltage battery: 12 × BOS-GM5.1 (61.44 kWh), 1 × HVB750V/100A-EU, 1 × 3U-HRACK

    • 20 kW
    • 61.44 kWh
    • 3 phases

    Suitable for: houses, business

    Availability to be confirmed
    UAH 742,100 excl. VATDetails

    FAQ

    What is included in the kit?

    Deye SUN-25K-SG01HP3-EU-AM2 inverter × 1; Deye HVB750V/100A-EU control unit × 1; Deye BOS-GM5.1 modules, 5.12 kWh × 10; Deye 3U-HRACK rack (12 modules + control unit) × 1. Not included in the price: cables between the battery and inverter, switchgear and protection in the distribution board, solar panels, installation, setup and delivery.

    How is the price calculated?

    Estimated kit price excl. VAT: the sum of average market prices of the components from sellers in Ukraine (checked on 15.10.2026; SUN-20K-SG05LP3 inverter and 3U-HRACK rack prices updated on 25.10.2026), rounded to UAH 100. Installation, cables and delivery are extra.

    Is the kit in stock?

    Stock availability and delivery time are being confirmed: click "Request a quote" and a manager will send you a commercial proposal with confirmed availability, price and lead time.

    How long will the kit power my site?

    It depends on the load. The battery's nominal capacity is 51.2 kWh; the calculator on the "Kits" page will show the approximate runtime for your load, or an engineer will calculate it in the quote.

    [→] — Request

    Tell us about your property

    We will select the configuration, check compatibility and calculate the cost with installation.

    Photos of the distribution board, a list of appliances or a roof plan are easier to send by e-mail. Planning an installation? Fill in the technical brief — for a home or a business.